Skip to main content

Defit & Make Good

Shop & Retail Strip Out & Defit Sydney

Retail and hospitality defits scoped around the lease, centre requirements, fit-out removal, access windows and required handover condition.

  • Fit out & joinery removal
  • Shopfront & signage defit
  • Hospitality fit out removal
Chocolate shop before strip out with mirrored display joinery along the sales floor

Free quote

Get a free quote

Tell us what needs to come out, where the job is and how we can access the space. Clear photos help Mick quote it properly.

Call Mick 0424 944 944

Photos of the space (optional, up to 5)

Shop & Retail Strip Outs & Defits

Shop Defits Delivered Between Tenancies, Not Around Them

Over 20 years’ experience preparing retail tenancies for lease handover

A shop defit removes everything the tenant added to a retail or hospitality tenancy: counters, display joinery, shelving, shopfront signage, change rooms, floor and wall finishes, and kitchen fit outs, returning the space to the base-building condition the lease requires. Master Strip Outs delivers shop defits across Sydney for retailers, cafe and restaurant operators, landlords and the agents managing the handover.

We recently completed a full shop defit of a sushi train restaurant in Mona Vale: the train conveyor and counters, commercial kitchen fit out, joinery, floor finishes and services all removed, and the tenancy handed back as a clean shell ready for the next fit out. Hospitality defits like that one carry extra scope, grease-laden exhaust, cool rooms and plumbing-heavy equipment, and we plan for it rather than discovering it mid-job.

View before & after gallery
Long sushi train tenancy with the central service counter before removalBefore
Cleared retail tenancy with low wall tiles, ceiling and lighting retainedAfter removal

Service Inclusions

Shop & Retail Strip Out & Defit Scope

From shopfront to back of house

01Shop & Retail Strip Out & Defit Scope

  • Fit Out & Joinery Removal

    Counters, display units, shelving, racking and built-in joinery dismantled and removed back to the base building.

  • Shopfront & Signage Defit

    Shopfront elements, signage and awning-line branding removed, with the frontage made safe and presentable for handover.

  • Hospitality Fit Out Removal

    Commercial kitchens, benches, cool rooms and exhaust fit outs stripped, with plumbing and gas capped by licensed trades.

02What shop & retail strip out & defit work needs

  • Lease scope checked first

    The removal list and base-building or make-good condition are worked through before dates are set.

  • Building rules built into the plan

    Inductions, work windows, lift protection, loading docks and neighbouring tenancies are considered before access and labour are priced.

  • Load-out planned around access

    Waste volume, carrying routes and loading arrangements are matched to the tenancy and building rather than treated as an afterthought.

Google reviews

What clients say.

Read current feedback shared on the Master Strip Outs Google profile.

How It Works

Our Shop & Retail Defit Process

From lease review to centre sign-off
  1. 01

    Inspection & Lease Review

    We inspect the shop, review the make-good clause and condition report, and confirm the handover scope with the landlord, agent or centre management.

  2. 02

    Centre & Programme Planning

    Inductions, hoardings and after-hours work windows are booked with centre management, and the programme is set to your handover date.

  3. 03

    Strip Out & Make Good

    The fit out comes out with neighbouring retailers protected: dust control, safe public separation and services capped by licensed trades.

  4. 04

    Handover Sign-Off

    The tenancy is left broom-clean and walked through against the agreed scope, with waste documentation provided for the handover file.

Your quote

What shapes a shop & retail strip out & defit quote

The price depends on what comes out, how the crew reaches it, the waste involved and how the area needs to be left.
01

Removal scope

The rooms, fixtures, finishes and structural boundaries included in the work are confirmed before pricing.

02

Access and material movement

Parking, stairs, lifts, loading areas, carry distance and available bin or truck access affect the removal method.

03

Waste type and volume

Material mix, weight, recycling options and the likely number of loads all affect the quote.

04

Building and handover requirements

Loading windows, lift bookings, centre rules and the agreed lease handover condition shape the programme.

Related Services

Other services for your project

Explore services for other parts of the strip-out or removal scope.

FAQs

Shop & Retail Defit FAQs

Common questions about retail defits in Sydney
View all FAQs
How long does a shop defit take?

Shop defit timing depends on tenancy size, fit out density, services, landlord requirements and how much of the work must run outside trading hours. Heavily fitted hospitality spaces, like the sushi train restaurant we defitted in Mona Vale, need a more detailed programme than a standard retail shell. We confirm the timeframe with your quote and work to your handover date.

Can you work around trading hours and centre management rules?

Shopping centres often require work outside trading hours. The available work window, inductions, contractor paperwork, hoardings and access routes must be approved by centre management and confirmed in the quote before the programme is agreed.

What happens to the shop fixtures and fittings?

We remove the tenant-installed items listed in the quote, including shelving, displays, counters, built-in joinery, signage and equipment. Metals, timber and cardboard are recycled where facilities accept them, with the balance taken to appropriate facilities. If particular fittings need to be kept for reuse, tell us at quote stage.

How do you handle the make-good requirements?

We scope the defit against your lease make-good clause and condition report, then record the agreed work boundary before starting. The quote states whether patching, restoration and final-walkthrough requirements are included or remain by others. The commercial defit and make-good page explains how the wider lease obligation is reviewed.

Do you handle restaurant and cafe defits?

Yes, hospitality is a big part of our defit work. Commercial kitchens, exhaust canopies, cool rooms, benches and grease traps all come out, with plumbing, gas and electrical capped by licensed trades. Our completed Mona Vale sushi train defit is a good example: a full hospitality fit out returned to a clean shell for landlord handover. Call 0424 944 944 to talk through your tenancy.

Shop & Retail Strip Out & Defit quote planning

Handing Back Your Shop? Get It Defitted Right

Site inspection and a clear quote after the lease, centre rules and approved work windows are reviewed.