Skip to main content

Sydney's strip out specialists

Master Strip Outs is insured and brings more than 20 years’ experience to residential, commercial and industrial strip-out work across Sydney.

Before we quote

Show us what needs to come out

Photos and a clear removal list help Mick understand the job. Larger, concealed or access-sensitive work may need a site walk-through.
  • Show each room or work area clearly
  • Point out anything that must stay
  • Include stairs, lifts, parking or loading access
  • Explain what the next trade or landlord needs
Master Strip Outs vehicles positioned on a residential driveway before garage demolition
Master Strip Outs vehicles on site

Working standards

The Master Strip Outs difference

Practical planning, direct communication and an experienced crew make the demolition stage easier for everyone who follows.

Practical Site Planning

We talk through removals, access, protection and waste before work begins, then price the job around the real site.

Careful Protection

Retained finishes, surrounding areas and structural elements are identified before demolition work starts.

Material Planning

The material type, volume and route out determine the crew, equipment and loading plan.

Direct Communication

Mick stays close to the job from the first photos or walk-through through to handover.

Access Planning

Lift bookings, loading zones, stair carries and bin placement are planned around the building and street conditions.

Clear Scope

The quote states what comes out, what stays and what condition the work area will be left in.

Site setup

Equipment and controls selected for the property

A ground-floor kitchen, a strata bathroom and a commercial tenancy all need a different setup. The crew, tools and load-out are matched to the site.
  1. 01

    Removal setup

    Tools matched to the material being removed Work areas separated from retained finishes

  2. 02

    Access protection

    Stairs, lifts and access paths protected where required Carry route confirmed before demolition begins

  3. 03

    Material handling

    Waste containers matched to site and street access Materials separated for recycling where facilities accept them

  4. 04

    Handover controls

    Retained items checked before the crew leaves Agreed strip-out waste removed from the work area Work area left tidy and broom-clean

Google reviews

What clients say.

Read current feedback from customers on the Master Strip Outs Google profile.

Next step

Get a free quote

Send photos, the suburb and what needs to come out. Mick will let you know whether anything else is needed to prepare the free quote.